This is our campus where the institution's administrative and coordination activities are carried out,and which is the central location of the support units.

Infrastructure Image
Infrastructure Image

The Erzurum DAG Campus is located southwest of the center of Erzurum, on the Karakaya Hills of Mount Palandöken, at an altitude of 3170 meters. The campus is situated on the summit of the Karakaya Hills near the Konaklı Ski Center.

Location
CampusLatitudeLongitudeAltitude
Erzurum DAG Campus39° 46' 43" N41° 13' 37" E3170 m
Transportation
RouteDistanceRoad ConditionTravel Time
Erzurum - Konaklı Ski Center27 kmHighway25 Minutes
Konaklı Ski Center - DAG8 kmMountain road10 Minutes
Meteorological Conditions

The data were measured with a Vaisala sensor during the period 2022–09.06.2025; deviations beyond ±2σ and empty/NaN data were filtered out.

ParameterAverageMinimumMaximum
Temperature (°C)3-2625
Humidity (%)631100
Pressure (hPA)521507692
Wind Speed (m/s)6125
Prevailing Wind DirectionSouth-Southwest (202°)South-Southwest (202°)South-Southwest (202°)
Snow Level (m)3.507
Average Snow Duration7 months7 months7 months
Infrastructure Image
Infrastructure Image
Infrastructure Image
Infrastructure Image

The weather within the campus is monitored via meteorological stations positioned at the telescope buildings. In addition, the general campus weather data can be monitored remotely via a web-based kiosk screen, and whether the sky is clear or overcast can be observed in real time with a sky camera.

Observational Quality Data
ParameterDAG CampusObservatory Average
Sky Background Brightness (Magnitude/Arcsecond²)21.4 – 21.821.4 – 21.8
Astronomical Seeing (Arcsecond)0.930.6 – 1.0
Number of Clear Nights (Night/Year)240200 – 300
Buildings and Facilities
BuildingContents
Telescope Building
  • Telescope with a 4-meter aperture
  • Focal Plane Instruments
  • Climate Control Systems
  • Electrical, electronic and control cabinets
Service Building
  • Control room
  • Mirror coating unit
  • System room
  • Mechanical installation room
  • Precision air conditioning units
  • Meeting room
  • Gym
  • 6 double staff bedrooms
HVAC Building
  • 3 air handling units (36,000 m³/hour)
  • 90 kW outdoor chiller
  • 2x 27 kW chiller (Annex building)
  • Fresh air dryer (4,000 m³/hour)
  • Liquid cooling collector line
  • Circulation pumps
  • Automation panels
  • Power distribution panels
Energy Building
  • SCADA system
  • Transformer and generator systems
  • 3.5 KM redundant line monitoring
  • Garage
  • 10-ton fuel tank
Security Building
  • 24/7 security service
  • Entry-exit control
  • Camera control screens
  • Radio systems
  • Visitor registration system
  • Emergency response equipment
Observatory Infrastructure Status
ParameterValue
Number of Locations18
Indoor Area4966 m²
Contracted Installed Electrical Power1200 kVA
Generator2x 450 kVA diesel – 1x 20 kVA diesel – 1x 5 kVA gasoline
UPS25 units (at various power ratings)
Internet Speed1000 Mbit (Fiber Connection)
Water Capacity77 tons
Observatory Campus Indoor Areas

The total indoor area of the actively used buildings, consisting of 18 locations within the Erzurum DAG Campus, is approximately 4970 m². The approximate indoor area details of the locations within the campus are presented in the table below.

Building NameBuilding LocationArea (m²)
DAG Service BuildingKarakaya Hills/Mount Palandöken / ERZURUM3000
HVAC BuildingKarakaya Hills/Mount Palandöken / ERZURUM160
Energy BuildingKonaklı Ski Center/Mount Palandöken / ERZURUM320
Security BuildingKonaklı Ski Center/Mount Palandöken / ERZURUM155
Warehouse BuildingKarakaya Hills/Mount Palandöken / ERZURUM500
Water ReservoirKarakaya Hills/Mount Palandöken / ERZURUM110
Mirya StationKarakaya Hills/Mount Palandöken / ERZURUM30
Atatürk University Earthquake Research Center StationKarakaya Hills/Mount Palandöken / ERZURUM3
Work Office ContainersKarakaya Hills/Mount Palandöken / ERZURUM40
Material ContainersKarakaya Hills/Mount Palandöken / ERZURUM225
TM 2 – TM 3 (Transformer Centers) and UPS KiosksKarakaya Hills/Mount Palandöken / ERZURUM120
Yakud BuildingKarakaya Hills/Mount Palandöken / ERZURUM21
Intermediate StationKarakaya Hills/Mount Palandöken / ERZURUM15
GRAND TOTAL4,699
Electrical Infrastructure
ParameterValue
Contracted Installed Electrical Power1200 kVA
Generator2 Diesel Generators (450 kVA) - 1 Diesel Generator (25 kVA) – 1 Gasoline Generator (7.5 kVA)
UPS25 units (at various power ratings)
Infrastructure Image
Infrastructure Image
Infrastructure Image
Infrastructure Image
Water Infrastructure and Supply
ParameterValue
Water Capacity77 tons (Modular water tanks)
Infrastructure Image
Infrastructure Image
Climate Control Systems
ParameterValue
Climate Control SystemActive - Passive Solar Energy Heating System
Lowest Indoor Temperature-7.5 °C
Türkiye Ulusal Gözlemevleri